Jilin Petrochemical catalyst mechanical loading efficiency

For the first time, Jilin Petrochemical Ethylene Glycol Plant adopts the domestic advanced Beijing principle to develop the catalyst mechanical packing technology independently developed by the Equipment Maintenance Co., Ltd. to refine and dispense imported barreled catalysts, saving a lot of manpower and improving work efficiency. .

The catalyst used in the ethylene glycol plant of the plant is packed in large barrels. Before loading, the unit catalyst capacity of each tube of the reactor needs to be divided into the same amount of small bags, which equals more than 9570 catalysts that need to divide more than 50 tons of catalyst. Such large-scale dispensing operations were previously completed manually, which was time consuming and inefficient. The sub-equipment that this factory replaces is advanced in function, distributes evenly, the quantity is moderate, reduce the workload of weighing. With this equipment, the plant can efficiently complete the task of reloading that used to take only one week to complete in just two and a half days.