Model No.: ESF-3015WGE
Laser Technology: Laser Control Fault Cutting
Design: Germany
Trademark: EKS
Transport Package: Wooden Packing
Specification: 3000*1500mm
Origin: China
HS Code: 8456100090

Product Parameters |
Brand and manufacturer | EKS Laser | Machine Model | ESF-3015WGE |
Dimension | 8800*4100*1900mm | Laser Power | 1000W (500W, 700W IPG, 750W Raycus, 1000W, 1500W options) |
Machine Weight | 4600KG (packed) | Fiber Laser Generator | Raycus, IPG, Optional |
Laser Wavelength | 1070nm | Laser Beam Quality | <0.373mrad |
Worktable | Sawtooth with Pneumatic Easy Moving Attachment | Fiber Laser Cutting Head | (WSX) Germany Technology, Compact, Convenient Focusing |
Focus Lens | Worthing (WSX) | Working Life of Fiber Module | Over 100,000 Hours |
Motors & Drivers | YASKAWA Servo Motor from Japan or Other Imported | Reducer | Imported High Precision, High Torque, Low Noise |
Guide Rails | High Accuracy Linear from Taiwan | Transmission System | Dual Drive Rack and Pinion, 4 Servo Motors |
Chain System | Enclosed High Quality | Water Chiller | TEYU (S&A) Brand, CW6200 |
Control System | Professional Laser Control System - Cypcut | Position Type | Red Dot Pointer |
Cutting Thickness | ≤5mm (Stainless Steel) | Max Idle Running Speed | 100 M/min |
≤12mm (Carbon Steel) | |||
Geometric Position Accuracy | Within ±0.08mm/M | Max Cutting Speed | 32 M/min |
Reorientation Accuracy | Within ±0.05mm/M | Lubrication System | Auto Electrical Motored, Fully and Sound |
Min Line Width | ±0.02mm | Power Consumption | 10-13KW Total |
Power Supply Voltage | 380V/50Hz/60Hz | Auxiliary Gas System | Japan SMC Series Components, Dual Air Inlets, Low Pressure Piercing, Automatic Pressure Adjustment and Switching |
Auxiliary Gas for Cutting | Oxygen, Nitrogen, Air | Compatible Software | Autocad, Coreldraw, etc. |
Graphic Format | DXF/PLT/AI/ | Working Method | Industrial PC Control with Console Desk and Remote |
Total Power Protection Rating | IP54 |
Applicable Industry and Cutting Samples
This machine is widely used in various industries such as advertising decoration, kitchenware, engineering machinery, steel and iron, automobiles, metal plate chassis, air-conditioner manufacturing, and metal plate cutting, among others.
Â
Delivery and Payment Terms |
1. Validity: The price is valid for 30 days. |
2. Price Term: EXW Maanshan or FOB Shanghai |
3. Payment Terms: Fiber laser machine: 30% deposit, 40% after acceptance, full payment before delivery; CO2 laser machine: 60% deposit, full payment before delivery. (Negotiable) |
4. Delivery Time: 25–60 working days after receiving your deposit. |
5. Shipment: By sea. |
Pre-sales & After-sales Service Commitment |
Pre-sales service: Free sample making For free sample making/testing, please send your samples or product CAD graphics to our company in China. Try before you buy. Progressive Solution Design According to the customer's product processing requirements, we can design a unique solution that supports higher manufacturing efficiency and better processing quality for the customer. After-sales service: Training to install: A. We will provide the machine with training video and user manual in English for installation, operation, maintenance, and troubleshooting, and offer technical guidance by email, fax, telephone/SKYPE/Wechat when you encounter problems during installation, use, or adjustment. (Recommended) B. You can come to EKS Laser factory for training. EKS Laser will offer professional guidance. Direct and effective face-to-face training. Here we have assembled equipment, all kinds of tools, and testing facilities. Training time: 3–5 days (Recommended) C. Our engineer will do on-site instruction training at your location. We need your help to handle visa formalities, prepay travel expenses, and accommodation during the business trip and service period before dispatch. It's better to arrange a translator for both engineers during the training period. Training time: 5–7 days Remark: The cost of air tickets and accommodation in your country will be borne by your side. Main training content includes: 1. Training on machine operating procedures; 2. Panel and significance of control parameters, parameter range of options; 3. Basic cleaning and maintenance of the machine; 4. Common hardware failure handling; 5. Issues to pay attention to during operation; 6. Additional technical support for product processing. After machine installation and testing, provide technical training for no less than two days until the customer’s operator can operate the device normally. |
Machine Installation, Debugging & Training Costs |
In the Chinese market, our company bears all costs of installation, training, and maintenance. In overseas markets, our company sends a technical engineer to your location for installation and training, and all expenses are borne by the customer party. The machine installation will be completed within 3–5 days for users. |
Quality Guarantee and After-sales Service |
The quality guarantee period is 12 months from the date the goods arrive at the destination port. Except for artificial damage, we are responsible for providing parts free of charge during the warranty period, but you must send the damaged parts to us via courier, with your charges, before we send back the replacement parts. After the warranty period, any required parts for repair or replacement will be paid for by the customer. |
Contact Us![]() |
|
 |
Shrink Film,Shrink Wrap,Pvc Shrink Film,Heat Shrink Film
Hebei Yintop Technology Co.ltd , https://www.yintoptech.com